Medical Silicone Prototyping: From Design to Production

10/29/20260

Prototyping silicone is not the same as prototyping plastic. Silicone shrinks 1.5–3 %, its hardness interacts with wall thickness, and a 3D-printed sample does not behave like a moulded part. Knowing what to validate — and when — saves a tooling change later.

Stage 1: DFM Review

Before any steel is cut, the drawing is reviewed for wall uniformity, inside radii (at least 0.25 mm), draft (0.5–1° on cored features), gate and parting-line location, undercuts, and tolerance classes per ISO 3302-1. This is the cheapest place to fix a problem, and the only place where a change costs nothing but an email.

Stage 2: Prototype Tooling

Options, in ascending cost:

  • RTV or 3D-printed tooling — fastest and cheapest, for form and fit only. Material properties will not match production.
  • Single-cavity aluminium tool — the usual choice for T1 samples in the production compound. Geometry, durometer, flash and demoulding all behave realistically.
  • Prototype multi-cavity tool — for clinical-build or pilot quantities before the production tool is committed.

Stage 3: T1 Samples and What to Validate

T1 parts should be used to validate, in this order:

  1. Geometry and fit against the mating assembly — silicone parts are usually assembled, not standalone.
  2. Durometer — sample two hardnesses if comfort or seal force is subjective.
  3. Function — seal pressure, actuation force, flow, insertion force, depending on the part.
  4. Material — confirm the compound documentation (FDA 21 CFR 177.2600, USP Class VI, ISO 10993) matches the intended contact.
  5. Sterilisation compatibility — if the device will be steam, EtO, gamma or e-beam sterilised, test the part after sterilisation, not before.

Stage 4: Design Freeze and Production Tooling

Once geometry and durometer are signed off, cavities are cut oversize to compensate for measured shrinkage — typically around 2 % for silicone, confirmed from first articles rather than taken from a generic table. Production tools are hardened steel with cold runner systems for LSR.

Stage 5: First Article Inspection and Process Qualification

First articles are measured under agreed conditions: 23 ± 2 °C, at least 24 hours after post-cure, with limited probe force or optical measurement. Process qualification (IQ / OQ / PQ) then fixes the validated window, and production runs under an ISO 13485 system, in an ISO Class 8 cleanroom where the application requires it.

What to Send with an RFQ

  • 3D file or drawing, with the critical dimensions marked — not every dimension is critical
  • Application environment: temperature range, media, mating parts, sterilisation method
  • Target durometer and material compliance requirement
  • Annual volume and target date — these drive tooling strategy more than anything else

FAQ

Can I get samples in the production material?

Yes, from an aluminium prototype tool. That is the difference between a sample that looks right and one that behaves right.

Why not just 3D print the prototype?

Printed and RTV samples are useful for form and fit, but they do not reproduce moulded surface, shrinkage, flash behaviour or mechanical properties. Use them early, then validate on moulded parts.

How long does prototyping take?

It depends on tooling route and how many iterations the design needs. A single-cavity aluminium tool is normally the fastest path to a representative part; send the project timeline and the tooling plan can be built backwards from it.

LSR Injection Molding · Compression Molding

Talk to the engineering team

Send a drawing or a project brief and get a manufacturability review, a process recommendation and a quotation.

Request a prototyping review


Leave a Reply

Your email address will not be published. Required fields are marked *



Get In Touch


E-mail: [email protected]

86 18106969228

https://lsrinjection.com


Our Network


Room 210, No. 89, Tianan Road, Jimei District, Xiamen, China

Privacy Policy