Fluid Handling & Sealing Components

silicone catheter-2

Fluid Handling & Sealing Components

As an ISO 13485 silicone manufacturer, LSR Injection moulds the silicone that carries, connects and seals fluid inside single-use and reusable medical devices – catheter shafts and tips, luer and needleless connectors, drainage components, gaskets, diaphragms, valves and stoppers.

Tooling, cleanroom moulding and validation sit under one roof, so a program moves from design freeze to serial production without being handed between suppliers.


Request Quote

What we mould for fluid paths and seals

Two families make up this market. Fluid handling parts determine flow and connection; sealing parts determine whether the assembly stays leak-free through its shelf life and through sterilisation.

Fluid handling components

Sealing, valves and gaskets

Where these parts fail – and how we design around it

Most fluid-path and sealing defects trace back to five issues. Each one is decided at the material and tooling stage, not caught in final inspection.

1. Leak paths at connection interfaces

A luer connection leaks when taper concentricity drifts or when silicone creeps under spring load. We hold taper geometry with hardened tool inserts, and specify compression set instead of relying on hardness alone – typical acceptance is 25-35% max after 22 h at 175 C (ASTM D395 method B).

2. Kinking and flow drop along a catheter shaft

Flow rate is lost to ovalisation before a shaft visibly kinks. The balance is durometer against wall thickness: most single-lumen shafts we mould sit between 30 and 50 Shore A with a wall thick enough to resist ovalisation at the bend radius the clinician actually uses.

3. Compression set after sterilisation

Steam and gamma both raise compression set, and a seal that passes before sterilisation can weep afterwards. Where the device is terminally sterilised, we mould grades selected for post-sterilisation recovery and validate the seal after the sterilisation cycle, not before it.

4. Extractables and particulates in the fluid path

Platinum-cured LSR removes the peroxide by-products of conventional curing. Post-cure and cleanroom handling then decide the particulate count – which is why these parts run in ISO Class 8 cells and are bagged in the same controlled environment.

5. Bonding silicone to a rigid housing

A connector body in PC, PSU or PEEK only holds if the substrate, primer and cure profile are matched. We validate pull strength on overmoulded samples rather than assuming adhesion from the data sheet.

Material and performance envelope

Typical ranges for the grades we run in this market. Final values are fixed by the device requirement and confirmed on the material certificate for each lot.

Property Typical value
Hardness 20-80 Shore A; sealing grades usually 30-60 Shore A
Tensile strength 6-10 MPa (platinum-cured LSR)
Tear strength 15-30 kN/m
Compression set 25-35% max, 22 h at 175 C, ASTM D395 method B
Service temperature -50 C to +200 C
Sterilisation Ethylene oxide, steam autoclave, gamma and e-beam
Biocompatibility ISO 10993-5, -10 and -11 test data available on selected grades
Colour and opacity Translucent, opaque, colour coded; radiopaque formulations on request

Regulatory and documentation support

  • ISO 13485 quality management system across tooling, moulding and assembly
  • ISO Class 8 (ISO 14644-1) cleanroom moulding and cleanroom packing
  • IQ/OQ/PQ and test method validation packages for transfer programs
  • Material master file and ISO 10993 test data support for 510(k) and EU MDR technical files
  • Lot traceability with CoA and CoC per shipment
  • Documented change control notification before any material or process change

Process routes we use for these parts

How a fluid handling program runs

1. DFM and material selection

We review wall sections, shut-off faces and the sterilisation route before quoting a tool. Material choice follows the fluid, the sterilisation method and the shelf life, not the price list.

2. In-house tooling

Tools are built in our own workshop, which keeps cavity-count decisions tied to your volume ramp rather than to a subcontractor’s lead time.

3. Validation

First article inspection, IQ/OQ/PQ and test method validation are documented for device transfer or for a 510(k) supplement.

4. Serial production

Cleanroom moulding, in-process inspection and lot release continue under the same quality system, with change control notification if anything in the process moves.

Anonymised case studies – device type, cavity count and annual volume – can be shared on request under NDA.

FAQ

What hardness range do you mould for sealing parts?

Most seals sit between 30 and 60 Shore A. Softer grades down to 20 Shore A are possible but need a design that avoids thin walls and deep undercuts.

Can the parts survive ethylene oxide and steam sterilisation?

Yes – both are routine for this product family, along with gamma and e-beam. We recommend validating the seal after the sterilisation cycle the device actually uses, because compression set changes with the method.

Do you overmould silicone onto rigid plastics?

Yes, onto PC, PSU, PEEK and selected nylons. Adhesion is validated by pull testing on production samples rather than assumed from the substrate data sheet.

What tolerance should we expect on a moulded seal?

Silicone is elastic, so tolerances are agreed per dimension with the shrinkage of the specific grade taken into account. Functional dimensions such as sealing beads are specified tighter than cosmetic ones.

Can you supply radiopaque catheter tips?

Radiopaque formulations are available on request; the filler loading is matched to the visibility requirement and to the flow behaviour in a small tip section.

Do you support 510(k) or EU MDR technical files?

We provide material master files, ISO 10993 test data, process validation records and change control documentation as inputs to your technical file. The regulatory submission itself stays with you as the legal manufacturer.

Send us the drawing, or the problem

If you already have a part number, send the drawing and the sterilisation route. If you are still at concept stage, describe the fluid path and the cycle the device has to survive – we will come back with a material and process recommendation before quoting tooling.


Get In Touch

E-mail: [email protected]

86 18106969228

https://lsrinjection.com


Our Network

Room 210, No. 89, Tianan Road, Jimei District, Xiamen, China

Privacy Policy